RENCANA UNTUK OPERASI KAPAL
![]() |
Ship operation |
- Ketersediaan informasi dan kriteria operasi yang mendefinisikan dan mendokumentasikan karakteristik layanan.
- Prosedur yang telah ditetapkan dipelihara dan tersedia jika ketidakhadirannya dapat berdampak buruk pada operasi yang aman dan perlindungan lingkungan.
- Personil yang memenuhi syarat untuk melaksanakan tugas yang diberikan.
- Kepatuhan terhadap aturan, regulasi, dan kode wajib.
- Penggunaan peralatan yang sesuai dan ketersediaan serta penggunaan perangkat pemantauan dan pengukuran.
No. |
Ranks |
Underway |
Berthing / Unberthing |
Cargo Operations |
Standby |
1st
Shift 0600hrs – 1200 hrs (AM / PM) |
|||||
.1 |
Master |
In command |
In command |
In command |
Overall In-charge |
.2 |
Second Engineer |
2nd In-charge of Engine
Room |
In-charge of Engine Room |
2nd In-charge of Engine
Room & Pump Room |
Assist C/E |
.3 |
Cargo Officer |
As requested |
Aft Mooring Station |
Monitoring Document |
Document |
.4 |
Bosun |
As per Watch Keeping Checklist |
Forward Mooring Station |
Deck crane sounding, etc |
General Maintenance |
|
|
|
|
|
|
.5 |
AB 1 |
On steering |
Forward Mooring Station |
Connecting hose / Assist Bosun 1 |
General Maintenance |
.6 |
AB 2 |
Lookout watch |
Aft Mooring Station |
Connecting hose / Assist Bosun 1 |
General Maintenance |
2nd Shift
1200hrs – 0600 hrs (PM / AM) |
|||||
.7 |
Chief Officer |
2nd In command |
2nd In command |
2nd In command |
2nd Overall In-charge |
.8 |
Chief Engineer |
In-charge of Engine Room |
In-charge of Engine Room |
In-charge of Engine Room & Cargo
pump |
Overall In-charge in Engine Room |
.9 |
Cargo Officer 2 |
As requested |
Aft Mooring Station |
Monitoring Document |
Documentation |
.10 |
Asst. Bosun |
As per Watch Keeping Checklist |
Forward Mooring Station |
Deck crane sounding, etc |
General Maintenance |
.11 |
AB 3 |
On steering |
Forward Mooring Station |
Connecting hose / Assist Bosun 2 |
General Maintenance |
.12 |
AB 4 |
Lookout watch |
Aft Mooring Station |
Connecting hose / Assist Bosun 2 |
General Maintenance |
No. |
Activities |
Responsible
Officers |
.1 |
Trim & stability checks |
Chief Officer / Cargo Officer |
.2 |
Cargo integrity & stowaway checks |
Chief Officer / Cargo Officer |
.3 |
Testing of bridge equipment |
Master / Officer of the Watch (OOW) |
.4 |
Charts & nautical equipment |
Master / Officer of the Watch (OOW) |
.5 |
Radio communications systems |
Master / Officer of the Watch (OOW) |
.6 |
Harbour / manning stations |
Chief Officer |
.7 |
Engine & auxiliary system checks |
Chief Engineer / Duty Engineer |
.8 |
Steering / stand-by equipment checks |
Chief Engineer / Duty Engineer |
.9 |
Safety & Security on deck |
Master / Officer of the Watch (OOW) |
.10 |
Safety & Security in engine room |
Chief Engineer / Duty Engineer |